Installation; Quick Installation Overview - Tectro TAW 200 Manuel D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

C

INSTALLATION

1. QUICK INSTALLATION OVERVIEW

Install the heat pump boiler securely on a floor surface which can bear the weight
of the heat pump boiler > 300 kg, including water and mounting materials. When
installed on an insufficiently strong floor surface, the heat pump boiler could fall
or the floor can break, causing injury and/or property damage.
Step 1)
Close the main water supply.
Step 2)
Choose a suitable place to install the heat pump boiler. Think about the
transportation to this place, the required service space and whether this
floor surface can bear the weight of the heat pump boiler filled with
water. See Chapter C.3, C.4, C.5 and C.6
Step 3)
Position the heat pump boiler level by twisting the feet at the bottom
of the heat pump boiler. Make sure the weight on the various feet is
divided evenly. See Chapter C2, C.3 and C.5
Step 4)
Connect the tap water tube of your water system to the heat pump
boiler. Make sure to install the one way safety valve and a Y-shaped
filter (not included) in the circuit. See Chapter C.2
Step 5) Connect the one way safety valve water drain to the sewer. See Chapter
C.2 and C.7
Step 6) Connect the water drain pipe with manual valve to your sewer. See
Chapter C.2 and C.7
Step 7) Connect the condensing water drain pipe to sewer. See Chapter C.2
Step 8) Connect the hot water outlet to your sanitary hot water system. See
Chapter C.2
Step 9)
Connect the inlet air duct and/or outlet air duct. See Chapter C.8
Step 10) Open main water supply and fill the heat pump boiler with water and
start the test run. See Chapter D.1 and D.2
Step 11) Plug in the power plug. See Chapter C.9
4
35

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Table des Matières