Setup And Operating Procedures; Battery Loading; Clock And Date Adjustment - Gima KD-595 Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38

Setup and operatIng procedureS

1. Battery loading

a. open battery cover at the back of the monitor.
b. Load four "aa" size batteries. please pay attention to polarity.
c. Close the battery cover.
When LCD shows battery symbol
all batteries with new ones.
rechargeable batteries are not suitable for this monitor.
remove the batteries if the monitor will not be used
for a month or more to avoid relevant damage
z
of battery leakage.
avoid the battery fluid to get in your eyes. If it should get
in your eyes, immediately rinse with plenty of clean water
Σ
IVD
and contact a physician.
1
the monitor, the batteries and the cuff, must be disposed
PHTHALATES
of according to local regulations at the end of their usage.

2. clock and date adjustment

a. once you install the battery or turn off the monitor, it will enter Clock
mode, and LCD will display time and date.
b. While the monitor is in Clock mode, press the "Start" and "mEm" button
simultaneously for two seconds, the month will blink at first.
press the button "Start" repeatedly, the day, hour and minute will blink
in turn. While the number is blinking, press the button "mEm" to increase
the number. Keep on pressing the button "mEm", the number will increase
fast.
c. You can turn off the monitor by pressing "Start" button when the minute
is blinking, then the time and date is confirmed.
d. the monitor will turn off automatically after 1 minute of no operation
with the time and date unchanged.
e. once you change the batteries, you should readjust the time and date.
ENGLISH
, replace
 
26

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

32940

Table des Matières