Connecting The Power To The Unit - Ingeteam INGEREV GARAGE Basic GB120-C1 Manuel D'installation Et Usage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Ingeteam
2.
Once it is hanging from the wall support, complete the attachment using a fastening element inserted
through the purpose-designed hole at the bottom of the station.
3.
Check that the unit properly secured.

7.3.2. Connecting the power to the unit

Cabling requirements
The connection must meet certain requirements:
Connection specifications
Connection type
Number of conductors
Nominal current
Conductor maximum diameter
Connection process
In order to connect the unit it is not necessary to open its front enclosure. A window is located at the bottom of the
unit, to access the terminal block to which to make the connection.
Upon receiving the unit the cover of this window is not installed.
1.
Insert the power cable through the packing gland located on the cover of the bottom window. Screw the
packing gland to the cover.
22
Single phase
2P + E
up to 32 A
10 mm
(2 x 6 mm
2
ABA2021IQM01_A - Installation and Operation Manual
Installing and connecting the unit
Three phase
3P + N + E
up to 32 A
)
2

Publicité

Table des Matières
loading

Table des Matières