EdilKamin IDROPELLBOX 15,7 Installation, Usage Et Maintenance page 38

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 42
4
3
2
g. C
SEASONAL MAINTENANCE (implemented by the DEALER)
e ore per orming an maintenance, disconnect the appliance rom the mains.
Clean the thermal stove internall and e ternall
Care ull clean the heat e change tu es
Care ull clean and remove dirt rom the com ustion cham er and the relative compartment
Clean the motors, veri
mechanical and clam loosening
Clean smo e channel replace seals on pipes and smo e e traction an cham e .
Chec the e pansion tan
Chec and clean the circulator
Chec the sensors
Chec and i necessar replace the cloc
Clean, inspect and scrape an residue rom the ignition resistance compartment and i necessar , replace it
Clean/chec the
noptic anel
isuall inspect the electrical ires, connections and po er ca le
Clean the pellet hopper and chec loosening o the eed scre - gear motor assem l
Chec and i necessar replace the door seal
unctionalit test load the eed scre , ignite, let it run or 10 minutes and shutdo n
N.B.:
1) If maintenance if not implemented, the warranty will be rendered null and void.
After implementing a normal cleaning procedure, INCORRECT coupling of the upper (A) ( gura ) and lower (B) ( gura
ce, ensure that the combustion chambers are correctly coupled as shown in ( gura ).
7
g. E
MAINTENANCE
4
5
atter on the control oard
ATTENTION !!!
A
B
g.
- 38
-
6
g. D
g.
-

Publicité

Table des Matières
loading

Table des Matières