Installing Eco9 - Dedicated Micros ECO 9 Guide D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
This reminder is provided to call the CCTV system installer's attention to Art.
820-40 of the NEC that provides guidelines for proper grounding and, in
particular, specifies that the cable ground shall be connected to the grounding
system of the building, as close to the point of cable entry as practical.
CE Mark
This product is marked with the CE symbol and indicates
compliance with all applicable directives.
Directive 89/336/EEC.
A "Declaration of Conformity" is held at Dedicated Micros Ltd.,
11 Oak Street, Swinton, Manchester M27 4FL.
4
Installing
BEFORE YOU START:
Check the contents of the box
The following items are included in the box:
PSU
Mains cable with three pin plug fitted (North America)
Mains cable without plug fitted (other regions)
Mains cable with two pin plug fitted (EC)
Choosing a location for installation
Eco9 is designed to be desk mounted. The following precautions must be
taken when installing Eco9:
Openings in the unit's case are provided for ventilation. To prevent
overheating, these openings should not be blocked or covered.
When stacking units, ensure there is at least a 1/2" (1.5 cm) gap between
each unit.
Ensure there is a 1" (3cm) gap on either side of the unit.
Ensure the unit is not located in an area where it is likely to be subjected to
mechanical shocks.
The unit should be located in an area with low humidity and a minimum of
dust. Avoid places like damp basements or dusty hallways.
If using external storage, refer to the manufacturer's instructions for
placement details.
If the unit is to be installed in a closed assembly, the maximum operating
o
temperature must not exceed 40
Ensure there is reliable earthing of the mains outlet when fitted to supply
connections other than direct connections to the branch circuit.
C.

Publicité

Table des Matières
loading

Table des Matières