Wall Installation And Connection - VOLTCRAFT CO-100 Notice D'emploi

Appareil de mesure du co2
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. WALL INSTALLATION AND CONNECTION

To operate the CO
corresponding holes on its rear.
Observe that the gas measurement aperture (see chapter 6, item „L") is free and not
blocked.
A mains socket also needs to be present in proximity of the CO
Proceed as follows:
• Disconnect the CO
Disconnect the low-voltage plug of the mains
adapter from the corresponding socket of the CO
meter.
• Loosen the single screw at the top of the casing and
then carefully fold down the front until it can be
removed.
• Remove the bottom plate. Four screws must be
removed for this.
• Now the bottom plate can be mounted on the wall
with the holes in it.
Ensure that no cables or lines are damaged when
drilling and screwing.
Also observe that the screws do not protrude too far
and damage the PCB. Use only flat-headed screws.
• Insert the PCB again and screw it on.
30
meter stationarily it can be mounted, e.g. on a wall, using the
2
meter from the mains voltage.
2
meter.
2
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10 25 41

Table des Matières