dirna Bergstrom bycool green line COMPACT 3.0 Instructions De Montage page 24

Masquer les pouces Voir aussi pour bycool green line COMPACT 3.0:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
EN
Position the interior air distribution panel on the
11
front studs with (1) M6 wide-rimmed washer
and (1) M6 nut on each stud. Tighten the nuts
until the foam duct comes up against the unit's
upper foam.
IMPORTANT: The rubber ducting must
being run into the upper rubber of the unit
to avoid air leaks.
11
EPDM
Gasket
Cabin roof
Upholstey
Tighten the nut in point 10a until it comes
12
up against the top part of the interior air
distribution panel.
12
EPDM
Gasket
Cabin roof
Upholstey
Unit base
D
Nut M6
Unit base
Nut M6 (10a)
Nut M6
Rubber ductings
Rubber ductings
24
Air conditioning for vehicles
Foam
Interior air distribution
panel
Foam
Interior air distribution
panel

Publicité

Table des Matières
loading

Table des Matières