wallas 88DU Instructions D'installation, De Fonctionnement Et D'entretien page 83

Masquer les pouces Voir aussi pour 88DU:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 127
2460 Closable lead-through
The cap of the closable lead-through must be detached for installation and seal
maintenance by pressing the spring indicated by the arrow in with, for instance, a
screwdriver. Take care not to let the screwdriver slip as the spring is very stiff. Hold
the cap with your other hand when pressing in the spring. When the spring is down,
pull the cap gently out of the frame. When assembling the lead-through, ensure
that the order of the parts is correct. Also make sure that the spring goes in the
correct hole in the cap. Otherwise, the lead-through cannot be closed.
Maintenance
To keep the seals from hardening, lubricate
them yearly with a heat-resistant petroleum
jelly.
ø 74 mm
min 150 mm
2448
Installation of the closable deck lead-through
2460. The installation cut-out is ø 45 mm and
the screw holes are 4 x ø 6 mm
88DU
Installation
Seals
Closable deck lead-
2460
through 2460 and lead-
through elevation 2069
for particularly demand-
ing conditions.
max 45 mm
- 83 -
ø 74 mm
2069
max 45 mm
GB
Cap
Frame
2460
100 mm
490070GB

Publicité

Table des Matières
loading

Produits Connexes pour wallas 88DU

Table des Matières