wallas 88DU Instructions D'installation, De Fonctionnement Et D'entretien page 82

Masquer les pouces Voir aussi pour 88DU:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 127
3468 General lead-through
You can install the general lead-through in a position of your choice, but ideally the
lead-through is installed in a position which allows it to function optimally.
1. If the lead-through is installed in the side of the boat or a deck structure, it should
be slightly inclined towards the stern so that the outer surface of the lead-through
will be cooled by the thermal current going through it as well as the wind.
2. If the lead-through is installed on the deck, it should be placed perpendicular to
the direction of the boat.
min 150 mm
min 60 mm
2448
General lead-through 3468 for fl ue gases and cooling
air installed in the side of the boat. The installation cut-
out is ø 45 mm and the screw holes are 2 x ø 6 mm
88DU
Installation
max 60 mm
3468
- 82 -
90 mm
max 60 mm
min 150 mm
General lead-through 3468 for
fl ue gases and cooling air instal-
led on the deck. The installation
cut-out is ø 45 mm and the screw
holes are 2 x ø 6 mm
GB
90 mm
3468
2448
490070GB

Publicité

Table des Matières
loading

Produits Connexes pour wallas 88DU

Table des Matières