Manual Operation; Installation - Key Automation TURBO 250 Manuel D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
1. Insert the key in position 1 lock and rotate 90° counter-clockwise (fig. 3)
2. Insert the unlock key in position 2 and rotate clockwise until complete unlock of the pinion (fig. 3).
Before starting installation, you should carry out the following checks, as well as making sure the
structure is compliant with current standards. Specifically:
Check that the wall and/or column are in good condition. If they are not, the fastening points
will need to be reinforced.
Make sure that the travel of the shutter is not obstructed in any way. The shutter must not
have friction, the movement in aperture and in closure must be free If stopped in any position it
must not move. During movement it must not slip.
Follow the dimensions, create a solid concrete footing and fix the base plate to the ground
immerging it into the concrete using the bracket clamps and fixing screws (fig.4). If the base al-
ready exists use robust expanding wedges.
Provide one or more pipelines for the laying of electrical cables.
N.B. IT IS NECESSARY TO KNOW THE DIMENSIONS OF THE RATCHET IN ORDER TO CAL-
CULATE WITH PRECISION THE POSITION OF THE COUNTER-PLATE.

MANUAL OPERATION

1 lock
2 unlock keys

INSTALLATION

Electrical
pipeline
16
Fig. 3
Fig. 4

Publicité

Table des Matières
loading

Table des Matières