Adding Fuel / Heating at Nominal Thermal Output
More fuel should be added to the fi re when the fl ames from
the previous burning off phase have just gone out.
Adding Fuel / Heating at Nominal Output
Procedure
Adjust secondary air.
Set secondary air slider to
position 2 (fi g. 4).
Add two logs weighing approx.
Open fi re box door.
1.9 kg in total.
Place logs with the end to the
front of fi re box. Only add a
single layer of fuel.
Close fi re box door.
Tab. 2
fi g. 4
34
8.
Emptying the Ash Drawer
As a safety precaution, please make sure that you only dispose
of ashes once they are cold.
The ash drawer contains the mineral components of the wood
(approx. 1%) as combustion residues.
Position of
Lift the fi re grate and tilt it towards the back (fi g. 5). The furnace
Control Elements
ash dump can then be removed (fi g. 6).