Télécharger Imprimer la page

Christopeit Sport Profi Center 9988 Notice De Montage Et D'utilisation page 24

Masquer les pouces Voir aussi pour Profi Center 9988:

Publicité

Les langues disponibles

Les langues disponibles

Step 13:
Installation of Stepper and Crossbar (22) at support 1
(4).
1. Place the crossbar (22) into appropriate position at support
1 (4) and rear foot (2), so that the holes are align and screw
it tightly by using screw M10x70 (112), washers 10//20 (118)
and self locking nut M 10 (124). (Note: Perhaps you have to
loosen the connection point of support 1 (4) and rear foot (2)
a little bit to mount crossbar easy.)
2. Put the left and right pedal (21+24) in right direction at
appropriate holder at support 1 (4), that the steel bearings
align and slide the axle 1 (34) through. Secure the axle 1(34)
by using screw M8x15 (99), spring washer for M8 (123) and
washer 8//38 (120) on both ends of axle.
3. Put the hydraulic cylinder (58) with top side onto the
holder of crossbar (22) and secure this position by using
screw M8x15 (99), spring washer for M8 (123) and washer
8//28 (121).
4. Scew the bottom end of cylinder (58)at the holder for
cylinder (46) by using screw M8x40 (103), washer 8//16 (117)
and self locking nut M 8 (125). Ensure that the cylinder (58)
can turn at holder a little bit.
5. Insert the holder for hydraulic cylinder (46) from top side
trough the pedal left and right (21+24) and connect the holder
(46) into desired position by using handgrip nut (75) and
washer 10//38 (120). You can adjust the stepper resistance
at holder (46) by choosing different positions at pedal left
and right (21+24)
6. Put a cable roller unit as fi gure „A" show together, put the
cable 5 (59) over the pulley (83) and connect this at cable
pulley holder incl. hook (35) in a way that the cable pulley
can roll easy.
7. Insert the cable pulley holder incl. hook (35) into the welded
holder at crossbars' (22) bottom side and connect the ends
of cable 5 (59) with the pedal left and right (21+24).
Step 14:
Installation of cable 1 for latissimus (26) with cable pulley
units. Please note following situation regarding the cable
pulley units: The cables have to put on the cable pulleys
(83) and should covered on both sides with cable pulley
covers (84) that the input and output of cable is leaded.
The cable pulley units have to install at the same time
with cables at right position.
1. Put the cable 1 (26) as showed in Step 14 drawing through
the top cross beam (5), screw the screw end of cable 1 (26)
with washer 12//24 (119) into the weight disk bar (40) and
secure the screw with nut.
2. Take cable 1 (26) and a cable pulley unit as showed in
fi gure „A" (without cable pulley cover) with screw M10x70
(112), washer 10//20 (118), plastic bushing for pulley (94) and
nut M10 (124). Insert the cable pulley (83) into the top cross
beam (5), position the plastic bushing (94) from outer side of
top cross beam (15) and screw in tightly.
3. Put a cable roller unit as fi gure „B" shows together with
screw M10x45 (110), washer (118) and self locking nut (124),
insert the cable 1 (26) and connect this at top cross beam
(5).
4. Take cable 1 (26) and a cable pulley unit as showed in
fi gure „B" with screw M10x70 (112), washer 10//20 (118),
plastic bushing for pulley (94) and nut M10 (124) and attach
it at cable pulley holder 2 (6).
24

Publicité

loading