Télécharger Imprimer la page

Condensate Pipe; Assembly; General; Connection On Heating Side - Dimplex LA 35TUR+ Instructions D'installation Et D'utilisation

Pompe à chaleur air-eau réversible pour installation extérieure

Publicité

Les langues disponibles

Les langues disponibles

LA 35TUR+

6.2 Condensate pipe

Condensate that forms during operation must be drained off
frost-free. To ensure proper drainage, the heat pump must be
mounted horizontally. The condensate pipe must have a mini-
mum diameter of 50 mm and must be fed into a sewer in such a
way that it is safe from frost. Do not discharge the condensate di-
rectly into clearing tanks or cesspits, as aggressive vapours or a
condensed water pipe which has not been laid in a frost-free
manner could destroy the evaporator.
ATTENTION!
The frost line can vary according to the climatic region. The regulations
of the countries in question must be observed.
7

Assembly

7.1 General

The following connections need to be established on the heat
pump:
Heating system flows and returns
Hot water circuit flow and return
Condensate outflow
Control line to the heat pump manager
Voltage supply
EN-6

7.2 Connection on heating side

The heating system connections on the heat pump are to be
made inside the device. Refer to the device information for the
connection sizes. An optional pipe kit is available as an acces-
sory, which can be used to lead the connections out to the side.
Use a spanner to firmly grip the transitions when connecting the
heat pump.
Before connecting the heating water system to the heat pump,
the heating system must be flushed to remove any impurities,
residue from sealants, etc. Any accumulation of deposits in the
liquefier could cause the heat pump to completely break down.
ATTENTION!
The dirt trap included in the scope of supply is to be installed in the heat
return before the heat pump.
Cleaning and maintenance instructions can be found in the dirt
trap's installation and operating instructions.
Once the heat pump has been connected to the heating system,
it must be filled, de-aerated and pressure-tested.
Consideration must be given to the following when filling the sys-
tem:
Untreated filling water and make-up water must be of drink-
ing water quality (colourless, clear, free from sediments)
Filling water and make-up water must be pre-filtered (pore
size max. 5µm).
Scale formation in hot water heating systems cannot be com-
pletely avoided, but in systems with flow temperatures below
60°C the problem can be disregarded.
With medium and high-temperature heating system, tempera-
tures above 60°C can be reached.
The following standard values should therefore be adhered to
concerning the filling water and make-up water (according to VDI
2035 Sheet 1):
Total heat
output in [kW]
up to 200
200 to 600
> 600
Use of the optionally available four-way reversing valve is recom-
mended. A detailed installation description can be found in the in-
structions included with the valve.
Note:
For operation of the heat pump with the four-way reversing valve,
it is essential to set up the hydraulic connections according to the
instructions included in the scope of supply of the valve. The in-
structions give a description of the precise procedure for the cor-
rect assembly of hydraulics. Non-observance of this will lead to
restrictions in the operation of the heat pump.
Important:
The notes/settings in the instructions of the heat pump manager
must always be observed and carried out accordingly; not doing
so will lead to malfunctions.
452163.66.06 · FD 9506
Total alkaline earths
Total
in mol/m³ and/or
hardness in °dH
mmol/l


2.0
11.2


1.5
8.4
< 0.02
< 0.11
www.dimplex.de

Publicité

loading

Ce manuel est également adapté pour:

452163.66.06