Installing Built-In Models - Hatco Flav-R 2-Go Manuel D'installation Et D'utilisation

Pizza locker system
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
8. Secure the unit to the floor by using the appropriate
fasteners through the floor plate and into the floor.
• The obround mounting holes are 1/2" wide.
Access
Panel
Screw
Installing a Floor Mount Unit to the Floor
9. Re-install the access panels on the bottom of each locker
column on the customer and operator sides using the
previously removed screws.
10. Plug the unit into a properly grounded electrical receptacle
of the correct voltage, size, and plug configuration. See
the SPECIFICATIONS section for details.

Installing Built-In Models

1. Cut the wall (if necessary) and build a rough opening in the
wall for the size of the unit being installed. Refer to "Rough
Opening Dimensions" in this section.
• Locate the unit in an area where the ambient air
temperature is constant and a minimum of 70°F (21°C).
Rough Opening Dimensions
Model
Width (A)
44-3/8" to 44-7/8"
F2GBP-12-C
(1127‒1140 mm)
44-3/8" to 44-7/8"
F2GBP-14-C
(1127‒1140 mm)
78" to 78-1/2"
F2GBP-21-C
(1981‒1994 mm)
78" to 78-1/2"
F2GBP-22-C
(1981‒1994 mm)
Wall Cutout Dimensions
2. Remove the access panels on the bottom and top of
each locker column on the customer side by removing the
screws.
Form No. F2GPM-0721
Mounting
Locations
Floor
Plate
Height (B)
32" to 32-1/2"
(812‒826 mm)
61-5/8" to 62-1/8"
(1565‒1578 mm)
17-3/16" to 17-11/16"
(436‒449 mm)
32" to 32-1/2"
(812‒826 mm)
A
B
3. Lift the unit and carefully place it into the wall opening
cutout. This step requires two or more people, depending
on the unit.
• The unit is placed into the wall opening from the
customer side of the wall.
Top Wall Bracket
Bottom Wall Bracket
Installing a Built-In Unit into a Wall
4. Verify that the unit is level before securing to the wall. The
self-closing doors will not work properly if unit is not level.
5. Secure the unit to the wall using the appropriate fasteners
through the wall brackets and into the wall.
• The unit must be installed with at least two fasteners
along the top wall brackets and at least two fasteners
along the bottom wall brackets.
Screw
Access Panel
Installing a Built-In Unit
6. Re-install the access panels on the bottom and top of each
locker column on the customer side using the previously
removed screws.
7. Install trim work around unit and wall cutout and/or apply
NSF-approved sealant around the edge of the unit and the
wall cutout.
8. Plug the unit into a properly grounded electrical receptacle
of the correct voltage, size, and plug configuration. See the
SPECIFICATIONS section for details.
9
INSTALLATION
Bottom Wall Bracket

Publicité

Chapitres

Table des Matières
loading

Table des Matières