Télécharger Imprimer la page

Helios KWL 470 W Notice De Montage Et D'utilisation page 48

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operating Instructions
EN
NOTE
NOTE
Central ventilation unit – KWL 470 W/W ET
> The settings for unit configuration are displayed.
4. Configure unit and click "Next".
> The settings summary page will open up.
5. Check settings and adjust if necessary.
6. Click "Previous" to adjust the settings.
7. Click "Finish" to complete the initial commissioning.
6.3
Software update
It is recommended that the ventilation unit is updated before adjustment.
The following options are available.
Update via the internet:
1. Connect your ventilation unit to your router using a LAN cable.
2. Access the local web server, as described in the ventilation unit installation and operating instructions.
3. Select the menu item Settings.
4. Enter the unlock code and unlock the settings menu.
5. Go to Connect on the Cloud service submenu.
The ventilation unit will now directly download and install the latest software version in the background.
Update via KWL-BE Touch:
1. Download the latest easyControls 3.0 firmware at www.heliosventilatoren.de in the Service area under Software.
2. Save this file to an empty Micro SD card and turn off the ventilation unit.
3. Insert the Micro SD card in the card slot on the connected KWL-BE Touch and turn on the ventilation unit again.
4. The update will start automatically in the background.
The KWL-BE Touch updates itself directly when it is restarted, afterwards the unit update is started. The upda-
te process of the ventilation unit takes up to 120 minutes with the KWL-BE Touch.
6.4
Adjustment
ⓘ The unit can only be adjusted following a successful initial commissioning. The adjustment is absolutely neces-
sary to ensure the optimal functionality of the unit.
6.4.1 Conditions for adjustment
• The installation of the ventilation system must be complete.
• Ventilation components such as the unit, distribution box and valves must be freely accessible.
• The unit must be electrically connected and operational (ensure clean filter in unit!).
• The ventilation valves must be fully open.
• The initial commissioning has been successful.
• All planned overflow openings (door gaps, ventilation grilles, or the like) between the rooms must be available and
clear.
• A flow rate calculation has been carried out for the individual operating points (total or per room). We recommend
calculation in accordance with DIN 1946-6.
17
Fig. 22

Publicité

loading

Ce manuel est également adapté pour:

Kwl 470 w et