Télécharger Imprimer la page

Steelcase Migration SE Guide Rapide page 30

Bureaux, bancs et tables de réunion
Masquer les pouces Voir aussi pour Migration SE:

Publicité

Les langues disponibles

Les langues disponibles

6 Maintenance
Interval
Before each
height
adjustment
Regularly
EN
6.3 Cleaning and care
PLEASE NOTE
Moisture could damage the control panel
and the power lift!
Only use polishing and cleaning agents that are suitable for
the respective materials (wood, plastic, metal, etc.).
30
Check point
Immediate
environment of
the desk
Desktop
Connections of
the electrical
supply lines
(cables)
Insulation of the
electrical supply
lines (cables)
Surroundings of
the electrical
supply lines
(cables)
}
Keep the control panel free of moisture and liquids.
}
Keep the power lift free of moisture and liquids.
Functional
Required state
check
screwed into the
horizontal
structure
Check safety
No objects in the
distance
lifting range
Check for
Level
horizontal
alignment
Check the
No damage
insulation for
damage
Check the
No damage
insulation for
damage
Check
Sufficient
clearance to
distance
hot objects
(e.g.
radiators)
Measures
(if
required)
columns
correctly
(direction &
cable!),
tighten
screws
Remove any
objects
Align using
the adjusting
screws on
the feet
Replace the
connections
Replace the
cables
Establish
distance

Publicité

loading