Télécharger Imprimer la page

GE UVC9480 Manuel Du Propriétaire Et Instructions D'installation page 12

Publicité

Les langues disponibles

Les langues disponibles

CABINET STRUCTURE
It is required two 2 x 4 horizontal studs separated
by 39" as part of the cabinet. They must be firmly
secured to the cabinet structure.
The cabinet bottom must be made from a wooden
surface ¾" minimum thickness.
C L
WARNING
bottom surface are firmly secured and able to
withstand 100 pounds.
CABINET PREPARATION
Side Panel
12
Installation Preparation - UVC 9480
2" Min.
39" Between
Studs
Make sure the studs and cabinet
C L
FRONT VIEW
CUSTOM CABINET FRAME
The custom canopy or cabinet must have a
rectangular opening to accommodate the custom
hood insert by itself. This opening has the same
size for both a wall installation or an island
installation. Ensure parallelism and levelness of
the cabinet so that it doesn't affect flushness of
the hood with the cabinet.
2" Min.
13" from
bottom of
cabinet to
bottom of
house duct
Side Panel
C L
21-1/4"
39"
between studs
45"
cutout width
7-5/8"
C L
15"
SIDE VIEW
Front of the
opening
recommended
to be 3" from
cabinet front
Back of
opening
recommended
to be 3" from
back wall
18-1/2" Min.
49-2000930 Rev. 2

Publicité

loading

Ce manuel est également adapté pour:

Uvc9420Uvc9420sl1ssGuvc9480slssUvc9420slssUvc9480slss