Télécharger Imprimer la page

Toro Z Master Professional 7000 Serie Manuel D'utilisation page 21

Masquer les pouces Voir aussi pour Z Master Professional 7000 Serie:

Publicité

Les langues disponibles

Les langues disponibles

Painted surfaces may be damaged by biodiesel
blends.
Use B5 (biodiesel content of 5%) or lesser blend
in cold weather.
Monitor seals, hoses, gaskets in contact with fuel
as they may degrade over time.
Fuel filter plugging may be expected for a time
after converting to biodiesel blends.
Contact your distributor for more information on
biodiesel.
Filling the Fuel Tank
1.
Park the machine on a level surface.
2.
Engage the parking brake.
3.
Shut off the engine and remove the key.
4.
Clean around the fuel-tank cap.
5.
Fill the fuel tank to the bottom of the filler neck
(Figure
8).
Note:
Do not fill the fuel tank completely full.
The empty space in the tank allows the fuel to
expand.
Figure 8
Switching the Fuel Tanks
Important:
Do not allow the machine to run out
of fuel, as this can damage the machine.
The fuel-selector valve is located behind the left side
of the seat.
The machine has 2 fuel tanks: 1 tank is on the left
side and 1 is on the right side. Each tank connects to
the fuel-selector valve. From there, a common fuel
line leads to the engine
To use the left fuel tank, rotate the fuel-selector
valve to the left. To use the right fuel tank, rotate the
fuel-selector valve to the right
Close the fuel-selector valve before transporting or
storing the machine.
1. Left fuel tank
Breaking in a New Machine
New engines take time to develop full power. Mower
decks and drive systems have higher friction when
new, placing additional load on the engine. Allow
40 to 50 hours of break-in time for new machines to
develop full power and best performance.
g027726
19
(Figure
9).
(Figure
9).
Figure 9
2. Fuel-selector valve
g000962

Publicité

loading