Télécharger Imprimer la page

ZANKER ZKB 7628 Informations A L'intention De L'utilisateur page 24

Publicité

Les langues disponibles

Les langues disponibles

24 electrolux
Instructions for the Installer
Installation and connection must be
carried out in compliance with the
regulations in force. Any interventions
must be carried out when the appliance is
switched off. Only accredited engineers
may work on the appliance.
The manufacturer disclaims any liability if
the safety measures are not observed.
Connecting to the electrical supply
Before connecting to the electrical supply, please make
sure:
-
The fuse and the domestic electrical installation must
be designed for the max. load of the appliance (see
rating plate).
-
The domestic electrical installation must be equipped
with a proper earth connection in accordance with
the regulations in force.
-
The socket or the multi-pole off switch must be easy
to access after the appliance has been installed.
This appliance is supplied with a connection cable
incorporating a standard plug, suitable for the total electric
load shown on the rating plate. The plug is to be inserted
into a suitable wall socket. If you require a direct connec-
tion to the electric network (mains), it will be necessary
to fit between the appliance and the mains an omnipole
switch, with a minimum gap between contacts of 3 mm,
suitable for the required load and in compliance with
rules in force. The green & yellow ground wire must not
be interrupted by the switch and it should be 2-3 cm.
longer than the other cables.
The mains cable and plug as supplied are to be
connected to a shockproof socket (230 V~, 50 Hz). The
shockproof socket must be installed in accordance with
the regulations.
The following types of mains cable are suitable,
taking the necessary rated cross section into account:
H07 RN-F, H05 RN-F, H05 RR-F, H05 VV-F, H05
V2V2-F (T90), H05 BB-F.
The connection cable must in any case be laid out
so that at no point does it reach 50°C (over room
temperature).
24
All manuals and user guides at all-guides.com
After the connection has been carried out, the heating
elements must be tested by being operated for about 3
minutes.
Terminal block
The oven is fitted with an easily accessible terminal
block which is designed to operate with a single-phase
power supply of 230 V (Fig. 9).
Letter L -
Live terminal
Letter N -
Neutral terminal
or E -
Earth terminal
Fig. 9

Publicité

loading