Ravelli RBH 150 V Manuel D'utilisation Et D'entretien page 79

Masquer les pouces Voir aussi pour RBH 150 V:
Table des Matières
Les langues disponibles
  • FR

Les langues disponibles

Rev.2 14/01/2021
Pag.23
If the compartment is not accessible, proceed as follows:
1 - remove the pullout part of the insert from the guides and the fixed base by undoing the 9 guide-fixing screws each side, after
pulling it out completely;
2 - fix the base in the reference compartment with 8 anchors, making sure it is flat-horizontal and perpendicular to the outer wall;
3 - make connections to the flue A
4 - make the electrical connection and/or ensure that the electric cable is run safely to the external outlet;
5 - after pulling out the telescopic guides from the base, refit the monoblock on them, carrying out the procedure of step 1 in reverse
order;
6 - check the sliding of the pullout part, locking of the latch and operation of the safety microswitch for the insert's power supply;
1
5
Installation and assembly must be done by qualified and/or authorized personnel.
The insert cannot be installed in bedrooms, bathrooms and in general in rooms where another heating unit is
already installed without an independent air inflow.
It is advisable to provide suitable fire-prevention devices for any eventuality.
Do not install the insert in places with an explosive atmosphere.
All manuals and user guides at all-guides.com
Use and maintenance manual RBH 150 V - RBH 200 V
2
Table des Matières
loading

Ce manuel est également adapté pour:

Rbh 200 v

Table des Matières