1 - INSTALLATION AND COMMISSIONING

1.4 - Commissioning

NOTE :
The equipment can be operated from a PC fitted with VT100 emulation and HTTP navigator;
its minimum configuration is defined in section 1.4.1.
A local terminal with VT100 emulation is indispensable during the first commissioning, in
order to be able to access the equipment via the management function; however, this
terminal only enables the communication function to be parameterized.
Procedure.
)
On the first commissioning, the equipment scans its constitution and considers it as the
expected configuration, in service, not monitored. It is thus advisable to insert the traffic
cards before power-up, in order to speed up the commissioning.
)
Switch on the power supply connected to the equipment.
)
The equipment conducts self-tests:
S
When self-tests have run correctly, the "ON" indicator light is illuminating,
S
In the opposite case, an indicator flashing code defines the faulty self-test (contact the
hotline).
)
Parameterize the communication interface, using the VT100 (see § 1.4.1).
)
Using the HTTP navigator, (see § 1.4.3).
S
Update the equipment time and date
S
Set each card under monitoring: validate the "Monitoring" command.
)
Connect the 2 Mbit/s and/or Ethernet ports, according to the equipment composition,
)
Connect the AUX and EOW ports required.
)
Download a predefined configuration or prepare the desired configuration, using the HTTP
navigator:
S
Create the connections
S
Establish the wished protection (MSP protection, SNC protection ...)
S
Choose the synchronization source, and change its parameters if required.
Change, if necessary, the configuration parameters and the alarm configuration.
S
The default configuration of the various parameters is provided by § 2.1.1.
)
Conduct the tests on STM-1 links, complying with the process described in Figure 1-2.
)
From that moment, the equipment is operational.
)
Operating alarms can signal a wrong connection of interfaces. Check the connection of ports,
the alarms corresponding to the connected ports, and correct any problems that may arise.
)
Save configuration.
REMARK:
It is possible, once the commissioning is performed, to connect additional 2 Mbit/s G.703,
Ethernet or STM1 ports, and to insert or extract powered cards.
Installation and User Guide - N56717020101
Page A1-20
No reproduction or communication without the written consent of SAGEM SA

Publicité

Chapitres

Table des Matières
loading

Table des Matières