Installing The Cable-Management Arm; Routing Cables - Dell PowerEdge 1750 Guide D'installation

Du rack
Masquer les pouces Voir aussi pour PowerEdge 1750:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
5X860eb0.fm Page 26 Monday, October 21, 2002 11:49 AM
8
9

Installing the Cable-Management Arm

See "Installing the Cable-Management Arm" in "Four-Post Rack Installation."

Routing Cables

See the procedure "Routing Cables" in "Four-Post Rack Installation."
You have completed the installation of the rack kit in a two-post rack.
1-26
Rack Installation Guide
All manuals and user guides at all-guides.com
Press the slide release latch at the side of each slide and push the system completely
into the rack (see Figure 1-18).
Push in and turn the captive thumbscrews on each side of the front chassis panel to
secure the system to the rack.