Preparations For Installation - Dalla Corte STUDIO Notice Pour L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Do not perform this operation alone.
We recommend the appliance to be handled by two persons. The manufacturer
cannot be held liable for damage caused by improper handling or failure to
comply with the aforementioned rules.

2. Preparations for installation

The appliance must be placed on a surface that can guarantee a safe support
of the equipment.
FOR THE WATER SUPPLY VERSION: When preparing the systems provide
an opening (A fig.1a) of at least 10x10 cm on the support surface in order to
carry out the connections with the systems in the below space (B fig.1a). The
water pressure must be between 0.1 and 0.6 MPa. Consult the manufacturer
in the absence of this last requirement.
A shut-off valve (1 fig.1a) must be installed between the water mains and
the water supply pipe of the machine in order to close the water passage in
case of need.
The appliance must be supplied exclusively with potable cold water in accor-
dance with and in compliance with national regulations.
Connect the appliance to a 16A socket. It is recommended to use a grounded
thermal-magnetic circuit breaker (automatic cut-out).
56 |

Publicité

Table des Matières
loading

Table des Matières