Gas Train; Gas Train Electricity Supply; Gas Feeding Line - Riello BS2D TL Instructions Pour Installation, Utilisation Et Entretien

Brûleurs gaz à air soufflé
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.4 GAS TRAIN,

(as EN 676)
The gas train is supplied separately, for its adjustment see the enclosed instructions.
GAS TRAIN
TYPE
MB ZRDLE 405 B01
MB ZRDLE 407 B01
MB ZRDLE 407 B01
MB ZRDLE 410 B01
MB ZRDLE 412 B01
3.5

GAS TRAIN ELECTRICITY SUPPLY

The gas train's power cables can be fed to the right or
left of the burner, as illustrated in figure 6.
Depending on the entry point, the cable clamp with
pressure test point (1) and simple cable clamp (2) may
need swapping over.
Consequently, you must make sure:
cable clamp (1) is positioned correctly;
the tube is positioned correctly so that there are no
restrictions likely to impede air flowing to the pres-
sure switch.
WARNING
If necessary, cut the tube to the right size.

3.6 GAS FEEDING LINE

1
– Gas supply pipe
2
– Manual cock (charged to the installer)
3
– Gas pressure gauge (charged to the installer)
4
– Filter
5
– Gas pressure switch
6
– Safety valve
7
– Pressure governor
– 1 st and 2 nd adjusting valve
8
M1 – Gas-supply pressure test point
M2 – Pressure coupling test point
3115
MATCHED
BURNER
CODE
3970540
BS2D
3970538
BS2D
3970541
BS3D - BS4D
3970542
BS3D - BS4D
3970543
BS3D - BS4D
1
2
CONNECTIONS
INLET
OUTLET
Rp 3/4
Flange 2
Rp 3/4
Flange 2
Rp 3/4
Flange 3
Rp 1 1/4
Flange 3
Rp 1 1/4
Flange 3
1
2
3
M1
4
5
6
D5209
7
GB
USE
Natural gas and LPG
Natural gas and LPG
Natural gas ≤ 150kW and LPG
Natural gas and LPG
Natural gas
Fig. 6
D7113
7
8
Fig. 7
2
1
M2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bs3d tlBs4d tl376161837617183761818

Table des Matières