Description Of Symbols; Standard Equipment; Preparing The Machine For - Viking GE 355 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57
4.9 Disposal
Waste products can be harmful to people,
animals and the environment. They must
consequently be disposed of properly.
Consult your recycling centre or your
specialist dealer for information on the
proper disposal of waste products. VIKING
recommends VIKING specialist dealers.
Ensure that old machines are properly
disposed of. Render the machine
unusable prior to disposal. In order to
prevent accidents, always remove the
power cable and electric cable to the
motor.

5. Description of symbols

Caution!
Read the instruction man-
ual before initial use.
Risk of injury!
Keep other persons out of
the danger area.
Risk of injury!
Rotating tools.
Keep hands and feet away
from apertures when
machine is running.
42
Risk of injury!
Switch off the motor and dis-
connect the power cable
from the machine before
working on the cutting tool,
before performing mainte-
nance and cleaning work,
before checking whether the
electric cable is entwined or
damaged and before leaving
the machine unattended.
Wear hearing protection.
Wear safety glasses.
Wear work gloves.
Risk of injury:
Do not climb onto the
machine.
Risk of injury:
Never put your hands or any
other part of your body or
clothing into the feed chute
or ejection chute.
Following actuation of the preselector
switch during operation, restarting is only
possible after 6 seconds.

6. Standard equipment

Item
Designation
A
Basic unit with lower chute
B
Upper chute
C
Wheel axle
D
Wheel carrier
E
Wheel lock
F
Bolt, M6 x 55
G
Hexagon nut
H
Wheel
I
Wheel cap
J
Wheel plug
K
Roll pin
L
Self-tapping screw P6 x 50
M
Discharge flap
N
Ejection chute extension
O
Strip
P
Pin
Q
Torx screw P5 x 20
R
Torx screw P5 x 10
S
Safety screw
T
Installation tool
U
Installation tool
Instruction manual

7. Preparing the machine for

operation
Avoid damage to the machine.
Strictly observe all tightening
torques in the following section
"Preparing the machine for
operation" to avoid damaging the
machine.
0478 201 9907 D - EN
2
Qty.
1
1
1
1
2
2
2
2
2
2
2
2
1
1
1
2
3
2
3
1
1
1

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ge 375

Table des Matières