Installation: Triango 80 C; Workload Data; Shortening The Ceiling Tube; Installing The Ceiling Holder - Derungs Dmed Triango 80 C Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 42
3.

INSTALLATION: Triango 80 C

3.1

Workload data

Bending moment M
B
Vertical weight F
G
3.2

Shortening the ceiling tube

Loosen the socket's fastening screws.
Pull the socket, complete with cable, out of the ceiling
tube using pliers on the inner ring.
Before shortening the ceiling tube, remove the cable
from the ceiling tube.
Use a hack saw to shorten the upper end of the ceiling
tube to the desired length, and then deburr it.
Remove the fastening screw "C".
Insert the ceiling tube "A" into the ceiling bracket "B"
and drill the ceiling holder's existing hole to 9 mm in
diameter. Drill the opposite hole separately.
Note: Pull the cable through from the lower side to the
upper pipe side (the 3-pin plug first) after sawing and
drilling.
Insert the cable with the socket back into the ceiling
tube.
Align the threaded hole in the socket precisely with the
existing hole in the ceiling tube and install the fastening
screw.
135 Nm
140 N
A
C
B

3.3. Installing the ceiling holder

DANGER
Assembly by qualified personnel
Assembly must be done by qualified personnel only.
Lack of appropriate knowledge may pose a death
hazard.
Two people are needed for assembly.
DANGER
Death hazard from falling luminaire.
The ceiling mount must only be mounted on ceilings
with a concrete stability class of B25 (C20/25) or
higher.
There should be no contact with reinforcement parts
of the solid ceiling during mounting. When in doubt, a
licensed technician must approve installation on the
specific installation surface. The load bearing
capacity of the ceiling structure must be planned,
checked and confirmed by a structural engineer
beforehand.
The holes must be drilled by a professional and in
compliance with the drilling tolerances permitted by
the manufacturer of the fastening anchor. If a drilling
error occurs, such as drilling into a reinforcement
bar, a structural engineer must be consulted.
Install the luminaire such that the vertical stops are
not continuously stressed during operation.
With plaster or cladding in front of concrete, the
fastening anchor must be driven completely into the
concrete.
The screws must be tightened carefully using a
torque wrench according to the specifications of the
fastening anchor manufacturer.
DANGER
Death hazard from electric shock.
All poles of the power cable must be disconnected
from the power grid from an external lockable switch.
ENG
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dmed triango 80 wDmed triango 80 f

Table des Matières