Epson BrightLink 475Wi Guide D'installation page 46

Masquer les pouces Voir aussi pour BrightLink 475Wi:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. After you finish making all of the adjustments in steps
socket head cap bolts (×2).
I
Adjust the forward/backward slide
1. Loosen the M4 × 12 mm hexagon socket head cap bolts (×2), and then adjust the slider for the wall
mount.
M4 × 12 mm hexagon socket
head cap bolts (x2)
2. After you finish making all of the adjustments in steps
socket head cap bolts (×2).
J
Adjust the vertical slide
1. Loosen the M6 × 20 mm hexagon shoulder bolt (
2. Adjust the vertical slide with the M8 hexagon bolt at the bottom of the wall mount, or the hexagonal
shaft at the top of the wall mount (
Tightening the M8 hexagon bolt lowers the wall mount, and loosening the bolt raises it.
Tightening the hexagonal shaft raises the wall mount, and loosening the shaft lowers it.
3. Tighten the M6 × 20 mm hexagon shoulder bolt you loosened in the first step (
E
J
to
E
J
to
).
).
Hexagonal shaft
M6 × 20 mm hexagon shoulder bolt
M8 hexagon
bolt
46
, tighten the M4 × 12 mm hexagon
, tighten the M4 × 12 mm hexagon
).

Publicité

Table des Matières
loading

Table des Matières