RIDGID VAC50000 Mode D'emploi page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SP6947 RIDGID 5 Gallon ESF_SP6947 3/11/15 9:49 AM Page 6
Storage Rack Assembly & Mounting (cont.)
2. Locate wall stud and position the
storage rack so that all four screw
holes are over the stud. Level the rack
and mark the hole locations. Drill a 1/8
inch diameter pilot hole at each
location. Attach the storage rack to wall
studs using the four screws provided.
Make sure all four screws are driven
securely into the wall stud.
3. If the desired location does not align
with a wall stud or the studs are
exposed, a 1/2 inch thick plywood
panel wide enough to span at least two
studs, must be attached to the studs
with the four screws provided. The
storage rack may then be attached to
the plywood panel with four 1 inch #10
pan or round head wood screws (not
provided).
NOTE: Supplied wood screws are
intended for mounting to typical wall
construction consisting of 5/8 inch drywall
or less.
CAUTION: To prevent plywood,
Storage Rack, or Wet/Dry Vac from
falling, make sure you have selected
the proper length of fastener for the
secure mounting of storage rack to
the wall.
6
Storage Rack
Screw (4)

Publicité

Table des Matières
loading

Table des Matières