Use; Daily Switch-On; Heating Phase; Delivery Of The Coffee - LaCimbali M21 Junior S/1 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
"Before using the machine make sure that:
- the main electricity supply ON/OFF switch
is ON
- The water in the reservoir must be at
the maxium level.".
Switch on the mains switch (1); Led (12) "machine on"
will ash.
If the water level in the boiler is below minimum, the "boiler
level" (16) lamp will light and the boiler will ll to the correct
level (lamp 16 off).
At this point, the "Heating phase" starts, at the end of
which led (12) remains lit, indicating that the machine is
ready to be used.
During heating, if one of the coffee dispensing switches
(2) is pressed, the machine dispenses a coffee at the
temperature reached at the time.
Heating is completed when the boiler gauge indicator (9)
remains stable in the green area.
The machine is now ready to dispense coffee, steam and
hot water.
The heating phase is completed when the boiler manometer
pointer (14) is stabilized in the green area and led (23)
remains lit.
At this point, the machine is ready to dispense coffee,
steam and hot water.
To ensure that the temperature of the group and that of the
lter carrier (7) is the same, press the coffee dispensing
button (2) and dispense water for a few seconds, then press
the stop button (15) again.
Remove the lter carrier, empty the old coffee grounds and
ll with 1 or 2 doses of ground coffee, according to the lter
carrier capacity.
Level off the ground coffee using the doser-grinder press.
Remove any ground coffee residue from the edge of the
lter.
Insert the lter carrier (7) into the group, ensuring it is well
fastened in place. Position the cup (or cups) under the
spout (or spouts) of the lter carrier (7).
Press the coffee button (2) to dispense coffee. Press
the Stop button (15) once the desired dose has been
dispensed.
coffee dispensing has completed.

USE

10. Daily Switch-On

At the end of the working day, switch off the mains switch
(1).

11. Heating phase

12. Delivery of the coffee

9 EN
16
12
2
4
7
2
7
1
15
14
9
15

Publicité

Table des Matières
loading

Table des Matières