Maintenance Schedule - BFT Aura 20U Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

If the station is configured with a Retracting device, lift the metal or plastic cover loosening
the four side screws and clean the front of the photocell as shown in the photo.

14.1 - MAINTENANCE SCHEDULE

Description of the activity
Tightening the electrical terminals
Tightening ground anchoring nuts
Cleaning the front
Cleaning the fan filter
Cleaning the Retractor (only for exit sta-
tion)
Cleaning the printer (only for entry station) every 8000
Checking the fan operation
Checking the anti-condensation resistor
operation
Detector loop sensor reset
Check of the ticket quality if the station
has been inactive for some time
38 - Aura20 U
Clean the
Pulire la parte
front of the
frontale della
photocell
fotocellula
Frequency
yearly
yearly
monthly
monthly
monthly
tickets or every
six months
monthly
every six
months
monthly
monthly
Type of action
tightening with tool
tightening with tool
washing with water
blowing with compressed air
blowing with compressed air and
electrostatic cloth
blowing with compressed air and
electrostatic cloth
visual check
check with contact and temperature
sensor
reset button pressure
visual and contact check

Publicité

Table des Matières
loading

Table des Matières