Télécharger Imprimer la page

Dri-Eaz F413-230V EU Manuel Du Propriétaire page 2

Publicité

Les langues disponibles

Les langues disponibles

• Designed for convenient stacking and transporting
on a handtruck.
• Recessed handles for easy positioning in confined
spaces.
• Quiet operation and low power consumption.
CONTROLS AND OPERATING IN-
STRUCTIONS
Set unit upright
NOTICE: Always store, transport, and use the unit in
a horizontal position. If the unit is ever placed in a
vertical position, return it to the horizontal position
and let it stand for at least 30 minutes before turning
it on.
Positioning a Dehumidifier
For best results, operate your dehumidifiers in an en-
closed area. Close all doors and windows that open to
the outside to maximize water removal efficiency. Place
your dehumidifier away from obstructions, and keep it
away from anything that could block airflow into and out
of the unit. For more information about creating an opti-
mum drying environment, contact Dri-Eaz Ltd at 0800
542 9609.
Set up drain hose
The Revolution condensate pump connects to a plastic
drainage hose. This hose is equipped with a quick-
connect fitting for quick attachment to the provided 12 m
drain hose. Unwrap the entire hose and place the unat-
tached end in a sink, drain, bucket or outdoors – any-
where that water can drain out safely. If you use a buck-
et or other container for water collection, check it regu-
larly to prevent overflows.
NOTICE: Uncoil and straighten the entire drain hose. Do
not leave any part of the hose coiled and do not place
the end of the hose higher than 6 m above the bottom of
the unit. Also check for kinks or other obstructions that
might restrict the flow of water. Obstructions may cause
a water backup and result in overflows.
Plug in electrical cord
The Revolution should be plugged into a 230V/50Hz
outlet.
Startup display and normal display modes
When unit is first plugged in to AC power, the control
panel display will briefly cycle through a series of
readouts. This is part of the unit's self-diagnosis proce-
dure and no user intervention is required.
Turn the unit on
The control panel on the Revolution dehumidifier has a
display and a touchpad with four keys. Press the
07-01899B F413-230V EUUK 2013-12
Warranty 07-00427 DoC 07-00289
Fig. A: Parts Identification
Air inlet
Cord and
hose storage
wraps.
Condensate
drain quick-
connect
ON/OFF to turn the unit on. The unit will now go through
a compressor delay countdown (up to sixty seconds in
duration) and a self diagnostics process.
Once the compressor delay countdown and self-
diagnostics are complete, the display will switch to nor-
mal display mode.
UNIT ON 00 HRS
INLET 00°C / INLET 00%
The first line of the display shows the total number of
hours the unit has been in operation. This value may be
reset to zero to track job hours (see "Job Hours Reset"
below). The second line of the display alternates be-
tween inlet temperature and inlet humidity.
2
Carry handles
Control
panel
Air outlet
Temp/RH
sensor
Remove/Insert
air filter here.
Dri-Eaz Products, Ltd.

Publicité

loading

Ce manuel est également adapté pour:

F413-230v uk