Ups Setup; Tools Required; Checking The Battery Recharge Date - Eaton Powerware 5125 Guide D'installation

Masquer les pouces Voir aussi pour Powerware 5125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Table 5. UPS Model Specifications
IBM Model Number
Output Receptacles
Input Connection
Power Rating
Voltage
Frequency
NOTE
For more information refer to "Specifications" in the Powerware 5125 User's Guide .

UPS Setup

NOTE If your UPS is already installed in an IBM pSeries (RS/6000) system, then skip
to "Installing Optional Equipment" on page 5.

Tools Required

To assemble the components, the following tools may be needed:
: Medium flat-bladed screwdriver
: #2 Phillips screwdriver

Checking the Battery Recharge Date

Check the battery recharge date label located on the UPS carton.
NOTE If the battery recharge date has expired and the batteries have never been
recharged, contact your service representative (see "Service and Support" on page 13).
Powerware
5125 Installation Guide for IBM Applications
®
P33
(9) IEC 320-C13, (1) IEC 320-C19
16A, IEC 320-C20 input connector
3.0 kVA/2.7kW
200–240V single-phase
50/60 Hz, auto-sensing
:
164201356 B Uncontrolled Copy
Installation
3

Publicité

Table des Matières
loading

Table des Matières