Hotswap Mbp-Module Operation; Ups Connection Without A Flexpdu Or Hotswap Mbp Module - Eaton Pulsar Serie Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour Pulsar Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
2. Installation

HotSwap MBP-module operation

UPS start-up with the HotSwap MBP module
1 - Check that the UPS is correctly connected to the HotSwap MBP module.
2 - Set switch (53) to the Normal position.
3 - Start the UPS by pressing the ON/OFF button (27) on the UPS control panel.
The load is supplied by the UPS.
LED (51) "UPS ON - OK to switch" on the HotSwap MBP module goes ON.
HotSwap MBP-module test
1 - Set switch (53) to the Bypass position and check that the load is still supplied.
2 - Set switch (53) back to the Normal position.

2.7 UPS connection without a FlexPDU or HotSwap MBP module

Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source
and the true electrical consumption of the total load.
Note. The UPS charges the battery as soon as it is connected to the AC-power source, even if button (27) is not
pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
EX 3000 XL: at least one additionnal EXB battery module must be connected to the UPS because it does not have
internal batteries.
Refer to EXB battery module installation manual (doc n° 34008167) for further information about connections.
34007776EN/AD - Page 12
51
52
53
7
9
10
8
35
32
31
The HotSwap MBP module has a rotary
switch (53) with two positions:
Normal - the load is supplied by the UPS,
Bypass - the load is supplied directly by
the AC-power source.
1 - Connect the supplied cable (31) (250 V -
16 A) to the socket (10), then to the AC-
power source.
2 - Connect the loads to the UPS using the
cables (32).
It is preferable to connect the priority loads
to the four outlets marked (9) and the non-
priority loads to the four outlets marked (8)
that can be programmed in pairs (1 and 2).
Connect any high-power devices to the 16
A outlet (7).
To program shutdown of outlets (8) during
operation on battery power and thus
optimise the available backup time, the
EATON communication software is
required.
3 - Fit the connection securing system (35)
that prevents the plugs from being pulled
out accidentally.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ex 2200 rt 2uEx 2200 rt 3uEx 3000 rt 2uEx 3000 rt 3uEx 3000 rt 3u xlEx exb rt 3u

Table des Matières