Installation and User Manual HELO CAVA / HELO ROXX DET
3.3.2. HELO CAVA – Assembly instructions for the heater soapstones
Before the installation of the soapstones the heater has to be fixed to the wall.
See the instructions on page 6.
Take the front soapstones out from the package.
The stone to be placed as the lowest has rounded lower corners. Pass the
stones carefully along the guide. The other (4 pcs) soapstones have even
edges and therefore it does not matter in which order they are placed.
Install the intermediate pieces (8) of the soapstones so that the projection
will always stay on the stone i.e. there will always be an air gap between
the stones.
The metal pieces are placed on each side between each stone (except the
uppermost).
Once the front soapstones have been installed, place the stones meant to
be inside the heater (approx. 30kg). Some stones also have to be placed
on the heating elements.
NOTE! No heater stones should be placed between the first heating
element and the front soapstones. The heater must not be used
without the front soapstones or when the stones have cracks on them.