RDI CROSSOVER Directives D'installation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FLUSH-MOUNT CONTINUED
4.
Position the lower post insert as shown at
bottom of post (Fig. 6).
NOTE: RDI railing kits are manufactured for
a 36" or 42" finished-rail height with a 2"
standard bottom space. If other heights or
bottom spaces are desired, adjust the height
of the post insert accordingly.
NOTE: If installing ADA Hand Rail
post, determine the mounting location and
create sufficient attachment by blocking
out post with 1" material or by purchasing
a third post insert and installing at desired
location (Fig 7).
4
5.
Slide the vinyl sleeve over the centering
extrusion. Mark and cut the sleeve to length.
Tip: The sleeve should extend above the
desired rail height enough to allow clearance
for a post cap (Fig. 8).
NOTE: If using a turned newel sleeve*, be
sure to leave enough flat area to accept rail
onto a
attachment brackets (Fig. 9). Remove the top
post insert set screw and the post insert. Use
this screw to attach the bottom post insert
to the post. Slide the top insert onto the post
after the turned sleeve has been installed.
* Endurance rail kits measure 34" or 40" from
the bottom of the bottom rail to the top of
the top rail.
(Fig. 6)
(Fig. 8)
(Fig. 7)
6.
Slide the vinyl sleeve over the structural post
and the post inserts (Fig. 10).
NOTE: The top post insert may need to be
repositioned depending on your application.
For example, in stair railing applications, the
post insert may need to be raised to allow
attachment of the stair brackets.
(Fig. 9)
(Fig. 10)

Publicité

Table des Matières
loading

Table des Matières