RDI CROSSOVER Directives D'installation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
Consult your hydraulic cement
manufacturer's specifications for core hole
diameter and depth based on the final railing
height for your installation. After depth and
diameter have been confirmed, drill and
remove the core from the hole (Fig. 1, 2).
2.
Place the post in the hole and adjust for
plumb (Fig. 3). Temporarily secure in place
using clamps and wood supports (Fig. 4).
Mix and pour hydraulic cement as per
manufacturer's instructions (Fig. 5).
(Fig. 1)
(Fig. 3)
(Fig. 2)
3.
After post has cured, follow the instructions
for RDI flush-mount structural post,
beginning with Step 4.
(Fig. 4)
(Fig. 5)
11

Publicité

Table des Matières
loading

Table des Matières