RDI CROSSOVER Directives D'installation page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
When installing a structural post in a flush-
mount application, be sure that sufficient
mounting structure exists to receive the post
attachment fasteners. Install blocking under
surface if necessary.
Tip: Thru-bolting using
/
" stainless steel
3
8
bolts is recommended to attain maximum
strength and durability. An additional base
plate is included for this application (Fig. 1).
B) Base Plate
2.
Determine the rail direction and orient the
structural post flange base accordingly (Fig. 2).
Tip: When a structural post will act as the
transition point between level and stair rail at
other than a right angle, be sure to set the
post in line with the stair rail. This will allow
the use of any RDI specialty bracket kit on
the level rail and standard RDI stair brackets.
(Fig. 1)
3.
After mounting location is confirmed, pre-drill
for permanent mounting hardware (Fig. 3).
Check and adjust structural post for plumb
using supplied vinyl shims (Fig. 4).
Secure the post through all four base
attachment holes (Fig. 5).
(Fig. 4)
(Fig. 2)
(Fig. 3)
(Fig. 5)
3

Publicité

Table des Matières
loading

Table des Matières