Installation; Unpack The Machine; Assemble The Guide Bar And The Chain - GreenWorks Pro CSB401 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
At the end of their useful life, discard
batteries with a precaution for our envi-
ronment. The battery contains material
that is dangerous to you and the envi-
ronment. You must remove and discard
these materials separately at a equip-
ment that accepts lithium-ion batteries.
11

INSTALLATION

Do not change or make accessories that are not
recommended by the manufacturer.
Do not put in the battery pack until you assemble all
the parts.

11.1 UNPACK THE MACHINE

Make sure that you correctly assemble the machine
before use.
If the parts have damage, do not use the machine.
If you do not have all the parts, do not operate the
machine.
If the parts are damaged or missing, speak to the
service center.
1. Open the package.
2. Read the documentation in the box.
3. Remove all the unassembled parts from the box.
4. Remove the machine from the box.
5. Discard the box and package in compliance with
local regulations.
11.2 ASSEMBLE THE GUIDE BAR AND
THE CHAIN
1. Remove the chain cover nuts with the wrench (43).
2. Remove the chain cover.
WARNING
WARNING
WARNING
WARNING
English
43
3. Put the chain drive links (21) into the bar groove
(20).
4. Put the chain cutters (22) in the direction of the
chain operation.
5. Put the chain in position and make sure that the
loop is behind the guide bar.
6. Hold the chain and bar.
7. Put the chain loop around the sprocket (17).
8. Make sure the chain tension pin hole on the guide
bar fits correctly with the bolt (16).
8
22
21
20
16
17
19

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

2000002

Table des Matières