Reservoir Fill Procedures - Cleveland KGT6T Manuel De L'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

KYM APPROVED - MARCH 14, 2011
CALIBRATING PROCEDURE
1.
Insure the unit has a vacuum before you begin
calibrating procedures. If unit requires venting refer
to Kettle Venting Instructions.
2.
Turn dial to "10" (Max.).
3.
Allow the unit to cycle twice.
4.
Check temperature of the inner kettle surface with a
digital surface thermometer.
5.
Temperature should be between 260° F and 265° F.
6.
Using a screw driver adjust temperature by turning
the potentiometer on the black box. Turn very little.
Turn clockwise to INCREASES and counter-clockwise
to DECREASE temperature.
7.
Allow the unit to cycle twice.
8.
Check temperature of the inner kettle surface with a
digital surface thermometer.
9. Repeat steps 4. through 8. until unit is calibrated.
PRESSURE
RELIEF
VALVE
PERIODIC
TESTING
PROCEDURE
PRESSURE RELIEF VALVE WILL
EXHAUST HIGH TEMPERATURE STEAM.
CONTACT WITH SKIN COULD RESULT IN
SERIOUS BURNS. KEEP FACE, HANDS
AND BODY CLEAR OF DISCHARGE .
WARNING: Kettle surface will be hot and steam will be
released during testing. Take necessary precautions
including the use of gloves and eye protection to prevent
personal injury.
1.
With the kettle empty, turn dail to "10" (Max.). Allow the
kettle to heat until the unit cycles off.
2.
Turn dial to "0" (Off).
3.
Stand to the side of the pressure relief valve discharge
tube and pull valve open for a maximum of one
second. Repeat test three to four times. Each time the
mechanism should move freely and be accompanied
by a rapid escape of steam.
If valve appears to be sticking replace pressure relief valve.
If foreign material is discharged then drain kettle and
replace pressure relief valve.
If Low Water Light comes on after this procedure, you need
to add water to the jacket (see RESERVOIR FILL
PROCEDURE).
DANGER:
0

RESERVOIR FILL PROCEDURES

C. Fill unit via 1/2" Street Elbow
DISTILLED WATER REQUIREMENTS
Kettle
Capacity
6 gallon
!
12 gallon
1. Ensure kettle is at room temperature
and pressure gauge showing zero
or less pressure.
2. Remove electrical plug from
power source.
Shut off gas supply to kettle.
3. Pull Pressure Relief Valve (A) open to insure vessel
is not pressurized.
4. Remove Pressure Relief Valve (A).
5. Replace Pressure Relief Valve (A) with 1/2" Street
Elbow (B).
6. Add distilled or bottled water (C)
through the Street Elbow (B),
using a funnel if necessary. Fill
the unit to the high level mark on
the Sight Glass.
7. Apply a thread sealant (i.e. Teflon tape) to the
Pressure Relief Valve's (A) thread and replace.
8. Reconnect gas and electrical supplies.
9. The kettle must now be vented. (Refer to the
KETTLE VENTING INSTRUCTIONS).
DANGER:
PRESSURE RELIEF VALVE WILL
EXHAUST HIGH TEMPERATURE STEAM.
CONTACT WITH SKIN COULD RESULT IN
SERIOUS BURNS. KEEP FACE, HANDS
AND BODY CLEAR OF DISCHARGE .
DANGER:
REMOVE ELECTRICAL POWER
0
PRIOR TO SERVICING.
Remove Pressure
B.
Attach Street
Elbow
*Important-
Pull ring on Pressure Relief Valve
prior to removal to
insure vessel is not pressurized.
0
When red "Low Water Light" comes on,
add distilled or botttled water.
70 ounces
120 ounces
!
*
A.
Relief Valve
150
200
100
250
20
30
50
10
40
300
0
0
50
350
60
400
psi
kPa
150
200
100
250
20
30
50
10
40
300
0
0
50
350
60
psi
400
kPa
150
200
100
250
20
30
50
10
40
300
0
0
50
350
60
psi
400
kPa
Sight
Glass

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kgt12tKgt12tgb

Table des Matières