BIO UV MP030 Serie Notice De Montage Et D'entretien page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
11
12
13
If your reactor is not fitted with PTFE rings, contact your retailer, who will supply the kit PDP003478
14
and the fitting instructions.
15
Take hold of the new lamp taking care not to place your fingers outside the cap.
16
(if you do, clean the lamp with a soft cloth and some methylated spirits).
17
18
19
20
21
22
MP 030 EL NM GB
Marque, Modèles et Brevets déposés - Produits exclusifs
Centre the quartz sleeve, it should stick out equally on both sides.
Change the quartz seals:
(Put new seals at each change of lamp)
● lubricate the seals using food grade grease,
● position them around the sleeve,
● push them fully home in their housing using your nail (help you with
aluminium washer.
Replace the aluminium washer with them PTFE ring and replace the MP nuts.
Put the installation back in pressure before the reassembly of lamps and
check that there is no leakage in the quartz sleeve.
Fully engage the lamp in the quartz sleeve.
Reposition the Teflon lamp supports (if your model is fitted with supports).
Replace the aluminium lamp base on both sides.
Rewire the UV lamp
Replace the two covers..
Check the calibration of the UV-C ray measurement cell.
(See chapter MANUAL OF THE MONITOR).
Copyright BIO-UV - 29/01/2009
Page 21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mp030 elMp030 nmMp030 es

Table des Matières