COMPULSORY INSTALLATION INSTRUCTIONS
It is preferable to install the UV reactor in By-Pass, and this must absolutely not be linked to pump
operation.
Instruction No. 1: The UV lamp must be HORIZONTAL whatever the position of the reactor.
Instruction No.2: The reactor must be correctly linked to the earth with a suitable wire of 6 mm²
minimum.
Instruction No.3: Fully observe instructions for the removal of lamps and quartz sleeves.
Instruction No.4: The UV sensor MUST be uppermost when the UV reactor is horizontal.
Instruction No.5: If the UV reactor is installed vertically, give preference to the input of water through
the bottom of the reactor and make sure that the purge valves are in the lower position.
Instruction No.6: Distance chemical products from the reactor to avoid any risk of corrosion.
UV REACTOR COMMISSIONING PROCEDURE
Action No.1: Fill the reactor with water and purge the air.
Check the absence of hydraulic leaks
Action No.2: Verify the correct operation of manual or automatic cleaning
Action No.3: Check the tightness of electrical terminal blocks and connectors
Action No.4: Calibrate the flowmeter
Action No.5: Turn on the lamps and check that they are working
Action No.6: Calibrate the UV sensor after a minimum of five minutes operation (UV lamp heating time)
Action No.7: Calibrate the 4-20 mA output (optional)
Action No.8: Test the correct operation of the flowmeter and the calibration carried out.
Action No.9: Fill in the maintenance sheet page 6
Reminder : If the UV lamps are turned off with the switch or the mains switch,
Wait 30 minutes befrore turning the UV lamps back on so as to not effect their
lifespan.