4. OPERATION
INSTALLATION AND FIRST OPERATION
Do not use the compressor immediately after unpacking as it will not
adjust to the ambient temperature.
Only qualified personnel can install the compressor and put it into
operation for the first time. The installer shall train the operating
personnel in the use and routine maintenance of the equipment.
Installation and training of personnel should be acknowledged by the
installer's signature on the installation certificate.
Prior to start-up must be unsecuring the air pump inside. If the
compressor is switched on with securing the air pump, the device
could be permanently damaged.
The compressor does not contain a backup power supply.
Never block the air intake filter on the backside or the vent outlets on
the lower of the equipment.
If the compressor is equipped with a main source of air, the standby air
source must be available.
Any modification of this equipment is forbidden!
If this equipment is used nearby other devices, the equipment must be
observed in order to verify normal operations in the configuration it will
be used.
Devices may be affected electro-magnetically!
You may notice a "new product" odour when you first place the
product into service (for a short period of time). This odour is
temporary and does not impede the normal use of the product. Ensure
the space is properly ventilated after installation.
NP-DK50 DI-17_03-2021
15
OPERATION