Balanced Body Allegro 2 Instructions D'utilisation page 23

Masquer les pouces Voir aussi pour Allegro 2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installing the Tower on the Allegro® 2
PARTS LIST
Description
Tower frame
Tower receiver brackets (1 pair)
Lower spring mounts (1 pair)
Push-through bar
T-pins
SoftTouch Single Loops
Roll Down Bar
Square Bumper
Springs:
Long Yellow Trap Spring
Long Purple Trap Spring
Short Yellow Trap Spring
Short Blue Trap Spring
Safety Strap w/ Carabiner
TOOLS
Wrench
1. REMOVE HEAD-END OF FRAME
Note: Two people are recommended for this process.
» Lift the head-end (the end
with the risers on it) of
the Reformer and place a
sitting box or some other
solid object underneath
the frame rails so that the
head-end is off the ground.
This will support the rest
of the Reformer when the
frame end is removed.
» Remove the two nuts at the
head-end of the frame rails
with the included wrench as
shown in Figure A.
Part Number
Qty.
617-061
950-171
950-170
617-064
GEN9892
101-033
1 pair
701-010
206-002
SPR9006
SPR9461
SPR9002
SPR9004
210-023
617-060
Remove these
two nuts
Figure A (shown from underside of
Reformer)
» Repeat on other side.
» Grab a riser and a leg
1
casting and pull the head-
1
end off the frame as shown
1
In Figure B. TIP: Some effort
1
will be required and rocking
2
the head-end from side to
side may help to loosen it
1
up.
3
» Remove the two black bumpers near the bolt holes on the
end casting and discard. If your reformer does not have them,
proceed to the next step.
2
2
2
2. INSTALL TOWER RECEIVERS
2
1
Take the Tower receiver brackets (they are attached to the Tower
for shipping purposes) and align them with the bolts at the end
of the frame rails. The bracket will be sandwiched between the
end of the frame rails and the head-end of the frame that was
1
just removed, as shown in Figure C.
Receiver brackets
Figure C
Figure B

Publicité

Table des Matières
loading

Table des Matières