Installation Procedure; Seal The Cooktop With Foam Tape; Prepare The Countertop; Attach Brackets To The Cooktop - Bosch NGT Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Procedure

1) Seal the Cooktop with
Foam Tape

2) Prepare the Countertop

3) Attach Brackets to the Cooktop

4) Install the Cooktop

5) Connect Gas Supply

WARNING:
cooktop, switch power off at the service panel and lock the panel to
prevent the power from being switched on accidentally.
Apply the foam tape packaged with the cooktop to underside of the cooktop along
the perimeter before installing.
Cut out the countertop per the dimensions shown in section Countertop Cutout
Dimensions above. For solid surface material installations such as Surell™ and
Corian®, consult with solid surface manufacturer. Apply heat reflective tape such
as Scotch Aluminum Foil Tape #425 or #427 around the cutout so that it folds over
on the top and sides. Do not wrap the tape underneath the cooktop. Be sure the
tape extends beyond the outermost flange of the cooktop. All corners should be
covered with tape.
Figure 3 - Counter Cutout – Solid Surface Countertops
Attach clamps of the hold-down brackets packaged with the cooktop to the rough-
in box. Use the washer and screws provided.
Figure 4 - Attaching Hold-Down Brackets
Insert cooktop into the cutout. Adjust hold-down brackets to desired position and
tighten screws to rough-in box. Insert adjusting screw into clamp and secure cook-
top to countertop.
For solid surface material installations: Insert a wooden block between the end of
the screw and the bottom of the countertop. Do not overtighten adjusting screw.
Trim excess aluminum tape around cooktop flange.
The gas inlet to the unit is located at the right rear of rough-in box. After installing
a gas shut-off valve in an easily accessible location under the unit, install the pres-
sure regulator (supplied) to manifold pipe using Teflon tape on threads of manifold
pipe. To prevent possible damage to the gas pressure regulator, install it after the
rough-in box is in its permanent position.
To avoid electrical shock hazard, before installing the
Cutout shows location
of Aluminum Reflective Tape
Heat Reflective Tape
Section "A - A"
English 5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ngp serie

Table des Matières