Installation Instructions; Preparation - GE GZS22DMJKFES Manuel D'utilisateur Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Instructions
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: GEAppliances.com
In Canada, call 1.800.561.3344 or Visit our Website at: www.geappliances.ca
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT
local inspector's use.
IMPORTANT
codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions for
future reference.
• Skill level – Installation of this appliance requires
basic mechanical skills.
• Completion time – Refrigerator Installation
30 minutes
Water Line Installation
30 minutes
• Proper installation is the responsibility of the
installer.
• Product failure due to improper installation is not
covered under the Warranty.
If the refrigerator has already been installed, remove
the base grille (see Step 2 in Moving the Refrigerator),
then skip to Step 5 in Installing the Refrigerator.
Refrigerator
Models 22, 23, 25, 26, 27 & 29

PREPARATION

WATER SUPPLY TO THE ICEMAKER
If the refrigerator has an icemaker, it will have to
be connected to a cold water line. A GE Appliances
water supply kit (containing tubing, shutoff valve,
fittings and instructions) is available at extra
cost from your dealer, by visiting our Website at
GEAppliances.com (in Canada at www.geappliances.
ca) or from Parts and Accessories, 877.959.8688 (in
Canada 1.800.661.1616).
TOOLS YOU WILL NEED
3/8" and 5/16" Socket
Phillips Head Screwdriver
18
1/2" and 7/16" Wrench
Plastic Putty Knife

Publicité

Table des Matières
loading

Table des Matières