Tools Required For Installation; Assembly Procedure - Quick A-F 300W Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BEFORE USING THE WINDLASS READ THESE INSTRUCTIONS CAREFULLY.
IF IN DOUBT, CONTACT YOUR NEAREST "QUICK" DEALER.
WARNING: the QUICK windlasses are designed to weigh the anchor. Do not use the equipments for
other purposes. QUICK shall not be held responsible for damage to equipment and/or personal
injury, caused by a faulty use of the equipment.
THE PACKAGE CONTAINS: windlass (on deck unit + geared motor) - reversing solenoid unit - base gasket
- Handle - bolts and screws (for assembly) - user's manual - warranty card.

TOOLS REQUIRED FOR INSTALLATION

Drill and drill bits: 9 mm, 11 mm, 55 mm Ø hollow mill; hex. wrenches: 10 mm and 13 mm
"QUICK"ACCESSORIES RECOMMENDED
• Anchoring RL control board (mod. 800) • Waterproof hand helds R/C (mod. 1002) • Foot switch (mod.900)
• Hydraulic-magnetic switch ( mod.10060) • Anchor chain counter (mod. 1102M and 1202M)
• Radio control (mod. 1302, 1352; 02, 302).

ASSEMBLY PROCEDURE

The windlass is made up of two separate parts:
• the upper part is to be installed on deck (base 4 or 16)
• geared motor is to be installed below deck (gearbox 11, electric motor 14).
1. Remove the nut (10) from the stud to take apart the on deck unit from gear box.
2. The windlass has to be placed in position by aligning the gypsy with the bow point (rope or chain leveled
with the deck and wound around the gypsy at an angle of about 180°).
3. Before drilling holes, check the following:there are to be no obstacles below deck in order to install the
bottom part. Deck thickness must range between 20 and 30 mm; for a different thickness, contact your
nearest QUICK dealer. Also make sure the top and bottom surfaces of the deck are as parallel as possible;
if necessary, compensate for any differences (if not parallel, the motor power may drop)
4. Once the ideal position has been found, drill the holes using the jig (6 or 15) supplied.
5. Place the upper part in position and connect it to the bottom part. Fit the shaft (21 or 22) into the
gearbox. Secure the windlass by using the studs (7) and the screws supplied.
6. Connect the power cables coming from the reversing solenoid unit to the electric motor.
WARNING: before wiring up, be sure the electrical cables are not live.
INSTALLATION
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

A-f 400w

Table des Matières