Check After Installation - Klarstein WINDWAKER Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Outdoor condensation drainage (heat pump type only)
When the unit is heating, the condensing water and defrosting water can be out reliably
through the drain house.
Installation
1. Install the outdoor drain elbow in Ø 25 mm hole on the base plate.
2. Joint the drain hose to the elbow, so that the waste water formed in the outdoor unit
can be drained out to a proper plate.

Check after installation

Electrical safety check
1. Check if the supply voltage is as required.
2. Check wether there is any faulty or miss connection in each of the power, signal
and grounding wires.
3. Make sure that the grounding wire of the air conditioner is securely grounded.
Installation safety check
1. Check if the installation is secure.
2. Check if the water drain is smooth.
3. Check if the wiring and piping are correctly installed.
4. Check that no foreign matter or tools are left inside the unit.
5. Check the refrigerant pipeline is protected well.
Chassis
Outdoor drain elbow
EN
69

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1003348210033483

Table des Matières