Klarstein WINDWAKER Mode D'emploi page 55

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Special instructions for installing and maintaining the air conditioner
• Fire prevention device shall be prepared before installation.
• Ensure that the installing site is sufficiently ventilated (open doors and windows).
• Ignition source, smoking and calling are not allowed in the area where R32
refrigerant is located.
• Anti-static precautions are necessary for installing the air conditioner, e.g. wear
pure cotton clothes and gloves.
• Keep leak detector in working state during the installation.
• If R32 refrigerant leakage occurs during the installation, you shall immediately
detect the concentration in indoor environment until it reaches a safe level.
If refrigerant leakage affects the performance of the air conditioner, please
immediately stop the operation, and the air conditioner must be vacuumed firstly
and be returned to the maintenance station for processing.
• Keep electric appliance, power switch, plug, socket, high temperature heat source
and high static away from the area underneath sidelines of the indoor unit.
• The air conditioner shall be installed in an accessible location to installation and
maintenance, without obstacles that may block air inlets or outlets of indoor/
outdoor units, and shall keep away from heat source inflammable or explosive
conditions.
• When installing or repairing the air conditioner and the connecting line is not long
enough, the entire connecting line shall be replaced with the connecting line of the
original specification; extension is not allowed.
• Use new connection pipe, unless re-flaring the pipe.
EN
55

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1003348210033483

Table des Matières