Door Panel Installation - golmar VistaPlus Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DOOR PANEL INSTALLATION

E
mbedding box
positioning.
1650
The upper part of the door panel should be placed at 1,65m. height roughly
The hole dimensions will depend on the number of door panel modules
M
odules
Model
An
Al
P
The door panel has been designed to be placed under most of the environmental conditions
However we recommended taking additional precautions to extend its working life
,
(visors, covered areas, ... To obtain optimum image quality on video door entry systems,
avoid direct incidences from light sources (sun, streetlights, ...
1
Compact
CE610
125
140
56
).
Break the bottom flange
In case of door panels with one or more embedding boxes
break the side flanges and link the embedding boxes using
UC junctions
.
1850
1450
2
CE615
CE620
125
125
220
257
56
56
).
to pass the cables through
.
.
3
CE630
125 mm.
374 mm.
56 mm.
P
reparing the cables entry
.
,
101
.
.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

50124536

Table des Matières