Connect Ductwork; Vented Installation - GE UVW9304 Manuel De L'utilisateur Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7 CONNECT DUCTWORK

A. Vented Installation
• Connect the house ducting to the top damper as
shown in Figure A.
• For back venting, connect the transition piece to the
back damper and the house ducting to the transition
as shown in Figure B.
• Seal all connections with duct tape.
Figure A
Figure B
CAUTION
Do not use sheet metal screws at
the transition to ductwork connection. Doing so will
prevent proper damper operations. Seal connection
with tape only.
22
Installation Instructions
Ceiling
House Ducting
Wall
Duct
House
Transition
Ducting
B. Recirculation (non-vented) Installation
NOTE: A recirculation duct (WB34X30519), and
Charcoal Filter (UXCF91), are not included with the
hood and are necessary for recirculation installation.
1. Attach the recirculation duct to the duct cover
mounting bracket with screws provided.
2. Connect the ducting from the exhaust outlet on the
hood to the recirculation duct. Use duct tape to seal
the connections.
Recirculation Duct
NOTE: Recirculation installation does not apply to 48"
models.
Duct Cover
Mounting Bracket
Use tape
(Do not use screws.)
1" = 2.5 cm; 1' = 0.3 m
49-2000707 Rev. 3

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Uvw9364Uvw9484

Table des Matières